Operation Cases

Operation of the 30,000 TPD Wastewater Treatment Plant in Shandong of China

The project was founded in the High-Tech Zone, with main industries of textile, chemical and food as well as new materials and high-end equipment manufacturing. The High-Tech Zone supporting wastewater treatment plant covers the area of 177,500 square meters, with the planned treatment scale of 30,000 m³/d.

Handling Process

Water Inlet — Coarse Grid Lifting Pump Station — Regulating Tank — Hydrolysis Acidification Tank A/O Tank — Secondary Sedimentation Tank — Secondary Lifting — Fenton Catalytic Oxidation Tower –Neutralization and Degassing Tank – -Flocculation Sedimentation Tank — Activated Sand Filter — Intermediate Tank — Activated Coke Adsorption — Disinfection Tank — Pasteurize Metering Tank — Constructed Wetland — Water Outlet

 

 

Water Inlet Standard

 

Water Outlet Standard

Indicators except TN. The CODcr, BOD₅, TP, SS and other indicators to implement the Environmental Quality Standards for Surface Water IV water standards.

 

Operational Achievements

After REC operation of wastewater treatment to reduce the pollutant content of wastewater efficiently, improve the ecology of the surrounding water ecosystems, and bring favorable eco-investment environment for the High-Tech Zone.

 

Contact Us

You are welcome to contact us by REC E-mail. You can also fill out the company information form online or message us. We will contact you as soon as possible.

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *