The Environmental Checkup Project for Wastewater Plants in Binzhou of China

The project scale of 30,000m3/d, with a total investment of about 200 million rmb, adopts MBR membrane technology, supplemented by AO biochemical system, “Fenton Oxidation + Flocculation Fluoride” process. At present, the outlet water COD is below 40mg/L, Ammonia Nitrogen is below 1.5mg/L, total Nitrogen is below 15mg/L, and Fluoride Ion concentration is below 1.5. Involved in printing and dyeing, slaughtering, biotechnology and light chemical industry and many other industrial companies.

 

 

Project Services

  • Through the data collection and collation, plant operations and environmental protection facilities investigation, process verification, sampling and testing, organization of relevant process tests and other aspects of work.
  • Comprehensive sorting Binzhou wastewater treatment plant in the treatment process, equipment maintenance, daily operation, depth treatment, solid waste disposal and other aspects of the problem, put forward rationalization proposals.

Service Achievements

  • Issue the Wastewater Treatment Plant Environmental Checkup Report, sort out the operation of the equipment of the whole process, and put forward the corresponding optimization and maintenance measures.
  • It analyzes the operation parameters of the main section of biochemical treatment section, judges the activated sludge properties, and puts forward adjustment methods and operation suggestions for the existing problems.

 

 

Contact Us

You are welcome to contact us by REC E-mail. You can also fill out the company information form online or message us. We will contact you as soon as possible.

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *